COLLECTOR OFFICE, PUNE
THE SPECIALITY OF THIS PUNES ICONIC PROJECT IS ITS ENTRANCE PLAZA STRUCTURE WHICH SPANS FOR COLUMN FREE SPACE OF 20M WIDTH AND 25M HEIGHT, ON TOP OF WHICH THE COLLECTOR OFFICE AND VIP MEETING ROOMS ARE LOCATED. THE PROJECT IS HAVING SLAB AREA OF 200,000 SQ.FT.

AISHWARYAM ONE MALL, PIMPRI
FIRST MALL IN PUNE WHERE PRESTRESSED PRECAST HOLLOW CORE SLABS & PRECAST BEAMS ARE USED. FLOOR AREA OF PROJECT IS AROUND 200,000 SFT.

NORTH COUNTRY MALL
PPS WAS PRINCIPAL STRUCTURAL CONSULTANT OF THIS LARGEST MALL OF MOHALI, CHANDIGARH, HAVING 1,800,000 SFT. SLAB AREA. IT HAS RETAIL, HYPERMART, NINE SCREEN MULTIPLEX, FOOD COURT, GAMING ZONE, SPACIOUS PARKING FOR 2200 NO. OF CARS.

DEEGEE IT PARK
IT IS AN IT PARK BUILDING WITH ATTACHED CIRCULAR SEVEN STORIED TOWER FOR CAR PARKING HAVING SLAB AREA OF 300,000 SFT. THE STRUCTURE IS BASEMENT+GROUND+NINE STORIED IT OFFICE FLOORS

HYOSUNG KHEDCITY, PUNE
THIS IS A SWITCHGEAR MANUFACTURING FACILITY BUILT ON A PLOT OF 14 ACRES. IT CONSISTS OF A FULLY HVAC PLANT BUILDING WITH MULTIPLE-LEVEL GANTRY AS WELL AS CANTILEVER CRANES. THE OVERALL HEIGHT IS 30MTRS

TGW, INDORE
ITS MANUFACTURING FACILITY FOR UK BASED COMPANY MAKING PACKAGING MACHINE KNIVES. THE SCOPE WAS COMPLETE CIVIL STRUCTURAL DESIGN, PMC. AREA WAS ROUGHLY 50,000 SQ.FT

ALSTOM-BHARAT FORGE PLANT
THIS IS SUPERCRITICAL TURBINE AND GENERATORS MANUFACTURING FACILITY IN GUJARAT. THERE ARE TWO MAIN STRUCTURAL STEEL BUILDINGS HOUSING 5MT TO 600MT GANTRY CRANES. THE OVERALL CONSTRUCTION IS ABOUT 8LAKH SQ.FT AND THE STEEL CONSUMED IS ABOUT 15000MT PILE FOUNDATIONS ARE USED IN THIS PROJECT

LOTTE CHOCOPIE, ROHTAK THIS IS CHOCO PIE MANUFACTURING FACILITY.
THIS IS THE CHOCO PIE MANUFACTURING FACILITY. THE MANUFACTURING BUILDING IS A STRUCTURAL STEEL CONSTRUCTION OF ABOUT 2.4 LAKH SQ.FT. WITH 40M SPAN.

PILGER FOUNDATIONS
THERE ARE TWO (18 LC & 75 LC) PILGER MACHINE FOUNDATIONS FOR TUBULAR EXPANSION PROJECT IN ARCADIA, LA.

DAHEJ PETROCHEMICAL COMPLEX
THIS IS AN AGRASS ROOT MEGA PETROCHEMICAL PROJECT COMPRISING NON-PLANT BUILDINGS, TECHNOLOGICAL STRUCTURES, EQUIPMENT, FOUNDATIONS, AND PIPE RACKS. THE MOC IS STRUCTURAL STEEL AND PILE FOUNDATIONS

BPCL CCR, MUMBAI
THIS IS A REFINARY EXPANSION PROJECT COMPRISING TECHNOLOGICAL STRUCTURES, EQUIPMENT, FOUNDATIONS, AND PIPE RACKS AS WELL AS BLAST-RESISTANT BUILDINGS. THE MOC IS STRUCTURAL STEEL AND RCC

PHOSPHATE ROCK GRINDING PLANT
THIS FERTILIZER PRODUCTION COMPLEX PRODUCES PHOSPHATE-BASED RAW MATERIALS FOR FERTILIZERS AND OTHER INTERMEDIATE PRODUCTS USING LOWER-GRADE PHOSPHATE ROCK. THIS COMPRISES OF CONCRETE SILOS FOR STORAGE, PROCESS STRUCTURE ON MAT FOUNDATIONS

RAPID -STEAM CRACKER COMPLEX,MALAYSIA
THIS IS A RAPID-STEAM CRACKER COMPLEX FOR PETRONAS MALAYSIA. THE SCOPE COMPRISES OF TECHNOLOGICAL STRUCTURES AND TALL PIPE RACKS IN RCC/ STRUCTURAL STEEL.

MARRIOT - US
THIS IS A SIX-LEVEL HOTEL PROJECT HAVING AN AREA OF 85,000 SQ.FT. FOR WHICH PRECAST CONCRETE HOLLOW CORE SLABS WERE USED AS A FLOOR SYSTEM. THE BIGGEST CHALLENGE FOR THIS HOTEL PROJECT WAS COORDINATION WITH DIFFERENT SERVICES (MEP) AND PROVIDING BLOCKOUTS AT ADEQUATE LOCATIONS TO PASS THE SERVICES.

NOVOTEL - IBIS COMBO HOTEL AT OMR
COMBO HOTEL PROJECT OF NOVOTEL AND IBIS HAVING 300+ KEYS. IT IS THE FIRST COMPLETE PRECAST CONCRETE HOTEL STRUCTURE OF ITS SCALE IN INDIA. IT IS LOCATED IN OMR CHENNAI. THE PROJECT IS HAVING SLAB AREA OF 300,000 SQ.FT.

CAIRN POLYMER STORAGE YARD, BARMER
THIS IS 20 20-ACRE FACILITY DEVELOPED BY CAIRN INDIA LTD FOR INTERMEDIATE STORAGE OF POLYMER FOR USE IN THE MANGALA PROCESS TERMINAL AND OTHER EOR PROJECTS. THE SCOPE INCLUDES PLANNING THE FACILITY, COMPLETE ENGINEERING, TENDER PREPARATION, AND VENDOR/CONTRACTOR EVALUATION

TYSON WEST METRO
THIS IS A METRO STATION PROJECT WHERE PRECAST CONCRETE FAÃÆ‘§ADE WALLS WITH EMBEDDED THIN BRICK HAVE BEEN USED. COORDINATION WITH DIFFERENT TRADES AND FIELD VERIFICATION WAS THE BIGGEST CHALLENGE FOR THIS PROJECT.

FABRICATION FACILITY, BARMER
THIS IS 15 ACRE FACILITY DEVELOPED BY CAIRN INDIA LTD FOR THE FABRICATION, AND STORAGE OF PIPES AND STRUCTURAL STEEL SECTIONS FOR THEIR CAPTIVE USE

MBA COLLEGE HINJEWADI
FIRST INSTITUTIONAL PROJECT IN PUNE WHERE PRECAST HOLLOW CORE SLABS ARE USED. THE PROJECT IS HAVING SLAB AREA OF AROUND 100,000 SFT.

LTU RESEARCH PARK IT IS THREE-STORIED COMPLETE STRUCTU
IT IS A THREE-STORIED COMPLETE STRUCTURAL STEEL BUILDING WITH CONCRETE SLAB ON METAL DECK FOR LOUSIANA TECH UNIVERSITY, USA.

LARGE MULTISTORIED CAR PARKING PROJECT
CAR PARKING STRUCTURE OF 1.6 MILLION SQ.FT. AREA AT MERCEDES BENZ, CHAKAN PLANT. THE PROJECT HAS PRECAST PRESTRESSED DOUBLE TEE ELEMENTS AND PRECAST PRESTRESSED BEAMS. THIS PROJECT WAS COMPLETED IN RECORD TIME OF 10 MONTHS.

TULSA - US
A PARKING GARAGE CONSTRUCTION IN THE UNITED STATES OF AMERICA WITH TEXTURED WALL PANELS WITH VERY UNIQUE PRECAST ELEMENTS.

ODU-PG
THIS IS A FIVE-LEVEL PRECAST PARKING GARAGE WITH AN AREA OF 1,72,000 SQ.FT. IT CONSISTS OF PRECAST ELEMENTS WITH DIFFERENT FINISHES AND WALL PANELS WITH BRICK FINISH & AND SHAPE OPENINGS.

MILLENIUM PARK
MIXED-USE DEVELOPMENT PROJECT WITH RESIDENTIAL APARTMENTS AND IT OFFICES IN THE CHIKHALTHANA INDUSTRIAL AREA OF AURANGABAD OF ABOUT 35 MILLION SQ.FT. SLAB AREA.

ECOPOLITAN PROJECT
IT IS A 2 MILLION SQ.FT. RESIDENTIAL DEVELOPMENT PROJECT. PRECAST WALL PANELS AND PRECAST SLABS ARE BEING USED FOR CONSTRUCTION OF P+14 TO P+22 STORIED BUILDINGS OF THIS PROJECT AT PUNAWALE FOR AHURA BUILDERS

TYSON WEST METRO
THIS IS A METRO STATION PROJECT WHERE PRECAST CONCRETE FAçADE WALLS WITH EMBEDDED THIN BRICK HAS BEEN USED. COORDINATION WITH DIFFERENT TRADES AND FIELD VERIFICATION WAS THE BIGGEST CHALLENGE FOR THIS PROJECT.

RAJIV GANDHI INTERNATIONAL CRICKET STADIUM AT DEHRADUN
IT IS A CRICKET STADIUM PROJECT AT DEHRADUN WITH SEATING CAPACITY OF 50,000. PRECAST BLEACHERS ARE USED IN THIS PROJECT.

WEST IRVING
THIS IS A MIXED USE DEVELOPMENT PROJECT, CONSISTING OF RESIDENTIAL APARTMENTS, COMMERCIAL STRUCTURE AND PARKING STRUCTURE. IT IS A NINE STORIED PRECAST CONCRETE BUILDING HAVING TOTAL AREA OF 1, 62,000 SQ.FT. PRECAST CONCRETE ELEMENTS USED IN THIS PROJECT CONSISTS OF SOLIDS SLABS, INSULATED WALL PANELS, DOUBLE WALLS ETC.

ESSEX COUNTY OF RECORDS PARKING GARAGE
This project involves the development of a large-scale parking garage, utilizing precast concrete construction for durability and efficiency. The structure spans a total area of 311,935 square feet and incorporates 620 precast concrete elements. These elements include solid slabs, insulated wall panels, and other custom precast components. The project required meticulous modeling, detailed erection drawings, and precise shop drawings to ensure seamless assembly and optimal functionality.

PSU Health Parking Garage
This project focuses on the development of a multi-level parking garage designed to cater to the parking needs of PSU Health. Spanning a total area of 406,250 square feet, the structure integrates 545 precast concrete elements, including solid slabs, insulated wall panels, and other structural components. The scope of work includes creating detailed shop drawings using the Tekla software platform to ensure precision in design and fabrication for efficient on-site assembly.

Miami Dade College Campus Parking Garage
This project involves the construction of a state-of-the-art parking garage at the Miami Dade College Campus, spanning an impressive 437,400 square feet. The structure comprises 1,207 precast concrete elements, including solid slabs, insulated wall panels, and other specialized components. Utilizing Revit as the software platform, the scope of work includes detailed modeling, comprehensive erection drawings, and precise shop drawings to ensure streamlined construction and superior performance.

The Standard Parking Garage
This project entails the development of a high-capacity parking garage in Gainesville, Florida, covering a total area of 406,250 square feet. The structure incorporates 1,463 precast concrete elements, including solid slabs, insulated wall panels, and other complex components. Leveraging both Revit and AutoCAD platforms, the scope of work encompasses detailed 3D modeling, comprehensive erection drawings, and precise shop drawings to support efficient and accurate construction processes.

Iron Mountain Data Center VA7
This project focuses on the construction of the Iron Mountain Data Center VA7, a high-security, cutting-edge facility located in Manassas, Virginia, covering a total area of 281,950 square feet. The building incorporates 1,227 precast concrete elements, including solid slabs, insulated wall panels, and other specialized components tailored for data center requirements. Utilizing Revit and AutoCAD software, the scope includes precise 3D modeling, detailed erection drawings, and accurate shop drawings to facilitate efficient manufacturing, streamlined assembly, and adherence to high-performance standards for this mission-critical infrastructure.

QTS_ATL2_OSGOOD
This project involves the construction of QTS_ATL2_OSGOOD, a sophisticated facility designed for advanced operations in Manassas, Virginia, spanning 331,719 square feet. The structure comprises 379 precast concrete elements, including solid slabs and specialized components. Using the Tekla software platform, the scope of work includes creating precise 3D models, detailed erection drawings, and accurate shop drawings to ensure efficient production and seamless assembly on-site. This meticulous approach supports high-quality construction standards and optimal performance.

Mainline Health Riddle Hospital
This project is the development of the Mainline Health Riddle Hospital facility in Media, Pennsylvania. The structure features 453 precast concrete elements, including solid slabs, wall panels, and other custom components designed to meet healthcare facility standards. The scope of work includes detailed 3D modeling, erection drawings, and shop drawings using Tekla and AutoCAD platforms to ensure precision in design, manufacturing, and assembly, delivering a high-quality and efficient construction process tailored to the healthcare sector.

First United Methodist Church - Spire
This project focuses on the construction of the First United Methodist Church - Spire in Marion, Iowa, spanning a total area of 32,517 square feet. The design incorporates 84 precast concrete elements, including custom components to align with the architectural and functional needs of the church. The scope of work involves creating detailed erection drawings and shop drawings using AutoCAD, ensuring precise fabrication and efficient assembly during construction for a structurally sound and visually appealing result.

Cedar Falls High School
This project involves the construction of Cedar Falls High School, a spacious educational facility covering a total area of 240,850 square feet. The structure is designed with 1,305 precast concrete elements, including slabs, walls, and other custom precast components. The scope includes precise 3D modeling, detailed erection drawings, and shop drawings, created using Tekla and AutoCAD software, ensuring an accurate and efficient construction process while meeting the specific needs of the educational institution.

Villanova CEER Building
This project focuses on the Villanova CEER (Center for Engineering Education and Research) Building, spanning a total area of 65,365 square feet. The structure incorporates 272 precast concrete elements, including slabs, walls, and specialized components. The scope of work involves creating detailed shop drawings using Tekla software to ensure precise fabrication and smooth assembly on-site, enabling the construction of a state-of-the-art facility designed to meet the university's engineering and research needs.

Mountaire Farms Processing Plant
This project involves the construction of the Mountaire Farms Processing Plant in Siler City, North Carolina, covering approximately 167,430 square feet. The facility is built using 1,294 precast concrete elements, including walls, slabs, and other custom components. The scope of work includes preparing detailed erection and shop drawings using AutoCAD software to ensure accurate fabrication and efficient on-site assembly, supporting the operational needs of the processing plant.

Torrey View Building
This project involves the construction of the Torrey View Building in San Diego, covering an area of approximately 62,700 square feet. The structure incorporates 769 GFRC (Glass Fiber Reinforced Concrete) panels, carefully designed for both aesthetic appeal and structural strength. The scope of work includes detailed 3D modeling, erection drawings, and shop drawings, utilizing both Revit and AutoCAD software to ensure precision and efficient construction. These drawings provide the necessary documentation for seamless manufacturing and on-site assembly.

Greater Windsor Recreation & Sports Center
This project involves the construction of the Greater Windsor Recreation & Sports Center in Windsor, Ontario, covering an area of approximately 100,000 square feet. The facility features hollowcore precast elements, designed to meet the structural and functional requirements of a recreational and sports center. The scope of work includes preparing detailed erection drawings using AutoCAD, ensuring accurate and efficient assembly during the construction process for a high-quality, durable, and functional facility.

Barnstable Bridge
This project focuses on the detailed engineering of the Barnstable Bridge in Milton, Ontario, with a total bridge length of 41.0 meters and a width of 23.0 meters. The bridge incorporates 800mm high box girder precast elements, designed for structural strength and durability. The scope includes detailed engineering, using AutoCAD to create precise designs and drawings, ensuring accurate fabrication and efficient assembly of the bridge's components. This approach guarantees the construction of a reliable and safe bridge structure.

Bridge Over Pike Creek
This project involves the detailed engineering of a bridge over Pike Creek in Lakeshore, Ontario. The bridge spans a total length of 29.0 meters with a width of 25.5 meters, and incorporates 1400mm high CPCI (Canadian Precast Concrete Institute) girders for strength and durability. The scope of work includes precise engineering of the bridge girder components, utilizing AutoCAD software to create detailed designs and drawings. These ensure accurate fabrication and seamless assembly, resulting in a robust and safe bridge structure.

Nomar Building
This project involves the creation of the Nomar Building located at 1699 Bayshore Highway, Burlingame, CA. The structure features 145 APC (Architectural Precast Concrete) panels, designed to enhance both the aesthetic and functional aspects of the building. The scope of work includes preparing detailed shop drawings using AutoCAD software, ensuring precise manufacturing and efficient on-site assembly of the precast components for a high-quality, visually appealing, and durable building.

WhirlyBall Center Brookfield
This project involves the construction of the WhirlyBall Center in Brookfield, Wisconsin, covering an area of approximately 43,913 square feet. The facility features 94 precast elements, which are essential for the building's structural integrity and aesthetic appeal. The scope includes preparing detailed erection drawings, shop drawings, and Bill of Materials (BOM) using AutoCAD software, ensuring that the precast elements are accurately fabricated and assembled, resulting in a functional and high-quality recreational center.

Seashore Trolley Museum
This project focuses on the Seashore Trolley Museum in Kennebunkport, Maine, covering a total area of 3,432 square feet. The structure features 106 lumber elements, including 17 trusses and 89 beams, which are key to supporting the unique design of the building. The scope includes preparing detailed erection drawings and 2D & 3D cut sheets using AutoCAD, which will guide the fabrication and assembly of the lumber components. The design incorporates a lumber shade with truss beams, providing both aesthetic appeal and functional strength.

Arena Sports Performance Center
This project involves the Arena Sports Performance Center located at 3400 Forbes Avenue in Pittsburgh, Pennsylvania, covering an area of approximately 9,000 square feet. The facility includes 72 precast elements, designed for both functionality and durability in a sports-oriented environment. The scope of work includes detailed modeling, erection drawings, and shop drawings, created using Tekla software. This ensures the precise fabrication and efficient assembly of precast components, contributing to the construction of a state-of-the-art sports performance stadium.

CBP-9K Parking Deck
This project involves the CBP-9K Parking Deck located in Charlotte, North Carolina, with a total area of approximately 295,700 square feet. The parking garage structure includes 994 precast elements, designed to meet the specific requirements for parking capacity and safety. The scope of work includes preparing detailed erection and shop drawings using AutoCAD, ensuring accurate fabrication and seamless assembly of the precast components, resulting in a robust and efficient parking structure.

West 21st Street
This project involves the development of a compact and specialized structure located at 541 West 21st Street in New York City. The design includes 36 precast concrete elements, crafted to meet the precise architectural and structural requirements of the project. The scope of work encompasses detailed 3D modeling, erection drawings, and shop drawings, utilizing Tekla and AutoCAD software. These deliverables ensure high accuracy and efficiency in manufacturing and on-site assembly, aligning with the demanding standards of urban construction.

OMR Combo Hotels Chennai, India
The OMR Combo Hotels project, located in Chennai, India, spans a total area of 300,000 square feet and is developed for Accor Hotels. The structural system incorporates precast hollow core slabs with a precast beam and column frame, complemented by precast cladding for enhanced aesthetics and functionality. The project falls under Earthquake Zone III, requiring meticulous design considerations to ensure structural safety and compliance. The scope of PPS includes detailed structural design and detailing to optimize the performance and constructability of this modern hospitality structure.

Rajiv Gandhi International Cricket Stadium, Dehradun
The Rajiv Gandhi International Cricket Stadium project in Dehradun involves the structural design and detailing of a world-class cricket facility. This stadium aims to provide an advanced sports infrastructure catering to both national and international events. The scope of PPS includes precise structural design and detailing to ensure the integrity, safety, and longevity of the stadium, considering the dynamic load conditions typical of such structures. Further details, such as the total area and specific structural systems, can be added to provide a comprehensive overview.

Nanded City Schools – 2 Buildings - Pune, India
The Nanded City Schools project spans a total area of 370,000 square feet and is developed by iBUILD. The structural system combines precast hollow core slabs and precast beams with reinforced concrete (RCC) columns and shear walls, ensuring durability and efficiency in construction. The scope of PPS involves comprehensive structural design and detailing, tailored to meet the functional and safety requirements of an educational institution, while optimizing for cost-effective and timely execution.

Nanded City School
The Nanded City Schools project spans a total area of 370,000 square feet and is developed by iBUILD. The structural system combines precast hollow core slabs and precast beams with reinforced concrete (RCC) columns and shear walls, ensuring durability and efficiency in construction. The scope of PPS involves comprehensive structural design and detailing, tailored to meet the functional and safety requirements of an educational institution, while optimizing for cost-effective and timely execution.

Central Logistics Center Pune
The Central Logistics Center is a state-of-the-art facility designed to cater to Volkswagen India Pvt. Ltd.'s logistical needs. Spanning 27,000 square meters, the project includes a warehouse, offices, utilities, and a security building. The facility features 23 dock levelers for efficient loading, unloading, and material handling. The main warehouse structure is a Pre-Engineered Building (PEB) designed to maximize space utilization and durability.
The fire-fighting system adheres to NFPA (National Fire Protection Association) and NBC (National Building Code of India) requirements, ensuring the safety and compliance of the facility. The project design is guided by Indian Standard Codes, NFPA standards, and other relevant regulations to achieve operational efficiency and safety.

Hyosung SPANDEX Aurangabad
The Hyosung SPANDEX project is a cutting-edge fiber manufacturing facility located in Shendra, Aurangabad. The facility includes several key components, such as the main plant building, utility areas, substations, tank farms, and pipe racks, all designed to support the production of SPANDEX fibers.
The scope of work encompasses obtaining government approvals, executing detailed civil and structural engineering, and providing stability certification to ensure the plant's compliance with safety and operational standards. The total construction area is designed to accommodate state-of-the-art machinery and infrastructure, supporting high-capacity manufacturing processes.
Further specifics regarding the total construction area can be added to provide a comprehensive overview.

KIA Motors Plant and KIA Affiliates Andhra Pradesh
The KIA Motors Plant and Affiliates project is a state-of-the-art car manufacturing facility located in Penukonda, Andhra Pradesh. This expansive facility includes the KIA main production unit and affiliate/vendor company units that support the car manufacturing operations.
PPS's scope of work involves the design review of the main production facility, originally executed by another company, to ensure compliance with structural and operational standards. Additionally, the affiliate units have been fully designed by PPS, covering detailed civil and structural engineering aspects. The overall stability certification for the entire facility is also within PPS's responsibility, ensuring safety and regulatory compliance for all structures involved in this large-scale manufacturing complex.

HOSTEL
The Hotels project, located in Chennai, India, spans a total area of 300,000 square feet and is developed for Accor Hotels. The structural system incorporates precast hollow core slabs with a precast beam and column frame, complemented by precast cladding for enhanced aesthetics and functionality. The project falls under Earthquake Zone III, requiring meticulous design considerations to ensure structural safety and compliance. The scope of PPS includes detailed structural design and detailing to optimize the performance and constructability of this modern hospitality structure.

Optic Fiber and Cable Project
This is optic fiber and cable manufacturing facility being built on a plot of about 40000 Sqm.
It comprises of main plant building, three storied admin building, Utilities, Guard House etc. (built up area 30000sqm). There are tall retaining walls using RE construction.

Project Fabrication Facility at Barmer
This is @ 60000 sqm facility developed by Cairn for fabrication and storage of pipes and structural steel sections for their captive use. This site is in desert place and have pipe fabrication shop, steel fabrication yard, painting facility and other supporting buildings such as laboratories, canteen, pump house, substations, etc.Indian Standard Codes and OISD

Polymer Storage Yard at Barmer
This site is in a desert place and includes development of loading/unloading areas, buildings such as admin buildings, driver's rest rooms, electrical substations, etc. This is an 80000-square-meter facility developed by Cairn for intermediate storage of polymers for use in Mangala Process Terminal and other EOR projects.
Indian Standard Codes and OISD

3.6M Optical Telescope Facility
Conceptualization, Planning, Engineering Procurement Assistance, Inspection, Preparation of
tender specificationsTechnical scrutiny of tenders, Vendor selection, Technical/Quality Supervision, Testing and Commissioning

KIA Motors Plant and KIA Affiliates
This is a new car manufacturing facility by KIA Motors.It consists of KIA main production unit and affiliate/vendor companies.PPS scope of work is design review of facility done by other company. Affiliate unit design has been done by PPS. The overall stability certification is in the scope of PPS

Turbine Manufacturing Facility
Steel Buildings JV-A and JV –B in total comprising @ 8.0Lac sq ft, housing overhead Gantry Cranes ranging from 5MT to 500MT. Maximum height of building 38m and span of 36m. The site is near sea coast and in high seismic zone. Indian Standard Codes

Multilevel Mechanized Car Park
This is Ground +3 level parking structure for housing 34 cars.The framework is using structural steel and on pile foundations. The car parking operations are automated.

Mangala Terminal Facility
For easing site construction, it is proposed to construct a modular framework which will be transported at site and only concreting will be done at site. The size of module is 15mx 4.0x 5.5m tall

Substation Container
These are containers in which high sensitivity equipment's are placed.The structural analysis is done using ANSYS/STAAD software'sThe CFD analysis is done using ANSYS Fluent and post-processing was carried out using ANSYS CFD Post to confirm suitability of proposed HVAC arrangement in the container.

MOBIS Warehouse
This is about 45000 sqm facility. The overall size of the Warehouse is 281m long x 144m wide and 10.6m clear height at eaves. A large area for dock levelers without columns is provided. In addition to the warehouse, utility building, office building, inbound/outbound office, STP, etc. are part of the facility.

OMR Combo Hotels Chennai, India
Area: 300,000 Sq. Ft. Client: Accor Hotels Scope of PPS: Structural Design & Detailing Structural Precast Hollow Core Slabs with Precast Beams & System: Column Frame with Precast cladding Earthquake Zone: III

Multilevel Precast Parking Garage at Chakan Plant, Pune
Area: 1.6 Million sq Ft.
Project Duration : 12 Months
PPS Scope : Plant Design, PMC and Detailed Engineering with preparation of Erection and shop drawings